欧美视频精品在线观看|亚洲另类视频图片小说|中文字幕在线成人免费看|欧美麻豆精品久久久久久|毛片一区二区三区在线观看|日本一区二区三区免费观看|久久乐国产精品亚洲综合18|欧美国产日韩欧洲中文在线不卡

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Usage and installation steps of hydraulic lifting platform

Source: Time:2020-03-14 09:02:33 views:

Usage and installation steps of hydraulic lifting platform

The usage method and installation steps of the 1137 hydraulic lifting platform. There are many details to pay attention to when using the hydraulic lifting platform. The following mainly discusses the installation steps of the hydraulic lifting platform:

1、 Compilation basis: Based on the user manual of the guide rail elevator, construction organization design, and on-site geological conditions.

2、 Preparation work before construction: (1) Inspect the work site for pits, ditches, hidden ditches, and holes, and check for high-voltage and communication lines above. If the above phenomena occur, take support measures. (2) Check for any obstacles on the entrance and exit roads. (3) The tools, toolboxes, rigging, rope buckles, safety helmets, safety belts, and other items used by various trades participating in the installation and dismantling of elevators (c ā n ji ā) shall be transported to the work site for backup.

3、 Foundation: The aluminum (Al) alloy elevator foundation has been processed by the civil construction unit (ch ǔ l ǐ).

4、 Basic requirements for safe operation: (1) Personnel involved in installation and dismantling must be familiar with the mechanical performance and structural characteristics of the elevator, and possess proficient operation and control techniques as well as the ability to troubleshoot general faults. (2) The workers involved in this work should have clear division of labor, each responsible for their own duties, with one person designated to direct the work and establish communication signals. (3) Adhere to all disciplines established to ensure safe production, carry complete safety equipment, and ensure that personnel working at heights meet the relevant regulations of the labor department. It is strictly prohibited to work under the influence of alcohol. (4) In the event of snow, rain, heavy fog, or weather with wind speeds exceeding 13 meters per second, this operation shall not be carried out. (5) The transformer power grid at the construction site shall have a transformer capacity of not less than 100KVA.

5、 Inspection after installation: (1) Recheck whether each fastening point meets the requirements, and tighten if there is any looseness. (2) Check if all components are complete and in effective condition.

6、 Installation completed:

(1) The trial operation of the crane includes trial operation, static load test, and dynamic load operation. Before the previous step is qualified, the next step of trial operation cannot be carried out. ?

(2) Clean the tools, rigging, equipment (sh è b è i), and debris on the construction site.

(3) Personnel and equipment exit the site.

{10}

Links

盐津县| 涿鹿县| 沙雅县| 都昌县| 韶关市| 托克逊县| 东乌珠穆沁旗| 赣州市| 辽宁省| 革吉县| 喀喇| 光山县| 嫩江县| 罗定市| 嘉禾县| 奈曼旗| 莱州市| 宁武县| 施甸县| 兴隆县| 宣汉县| 绥宁县| 五家渠市| 抚顺县| 海淀区| 西平县| 井冈山市| 海丰县| 修水县| 青铜峡市| 金乡县| 铁力市| 洪泽县| 新乡县| 乌恰县| 浏阳市| 安丘市| 依安县| 凭祥市| 武乡县| 漳平市|