欧美视频精品在线观看|亚洲另类视频图片小说|中文字幕在线成人免费看|欧美麻豆精品久久久久久|毛片一区二区三区在线观看|日本一区二区三区免费观看|久久乐国产精品亚洲综合18|欧美国产日韩欧洲中文在线不卡

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

The factors that determine the lifting speed of the lifting platform!

Source: Time:2020-02-17 09:02:50 views:

The factors that determine the lifting speed of the lifting platform!

The platforms produced by the company are all hydraulic lifting platforms, which are driven by a power unit to generate pressure through hydraulic oil, causing the oil cylinder piston to reciprocate and drive the lifting platform to lift. The lifting platforms can be divided into fixed lifting platforms and mobile lifting platforms. Depending on the model, load capacity, lifting height, and workbench, the operating speed of the lifting platform varies. Therefore, the lifting speed of the elevator can be adjusted:

?

1、 Power unit adjustment, whether it is a scissor lift platform or a guide rail lift platform, is controlled by the power unit and oil cylinder. The power unit is equipped with four outlet holes during production, which can be adjusted in size to increase or decrease the hydraulic oil flow rate (unit: cubic meters per second) of the oil cylinder. We can adjust the hydraulic oil flow rate by (t ō ng gu ò) adjusting the motor, engine speed, or electro-hydraulic proportional valve;

2、 Oil pipe control: The longer the hydraulic oil pipe, the longer the rise time. Therefore, during installation, the length of the oil pipe should be minimized as much as possible within the design allowable range (f à n w é i); On the basis of adjusting the power unit, the size of the oil pipeline can also be adjusted, and corresponding adjustments can be made while ensuring that the equipment (sh è b è i) meets normal safety requirements.

3、 The load capacity of the goods and the tonnage of the transported goods also affect the speed of lifting and lowering. Reaching the value of the lifting platform for transporting goods is the guarantee of speed. If the goods are too heavy, it will affect the speed. If the goods are too light, it will also affect the normal transportation time.

4、 Oil cylinder control, oil cylinder size, may minimize the size of the oil cylinder as much as possible while meeting design requirements. The smaller the size of the oil cylinder, the faster the ascent speed.

But the overall lifting speed of the elevator is about 35 meters per minute, too fast will affect the service life of the equipment (sh è b è i)!

{6}

Links

金门县| 柯坪县| 镇原县| 包头市| 封开县| 壶关县| 稻城县| 织金县| 灌阳县| 民乐县| 大荔县| 鹤壁市| 阳西县| 大庆市| 玉田县| 平阳县| 琼结县| 长海县| 淮安市| 丰原市| 民丰县| 于都县| 樟树市| 定兴县| 务川| 墨脱县| 乡城县| 如皋市| 临潭县| 屏山县| 雷州市| 龙州县| 大厂| 同仁县| 铁岭市| 涞水县| 嘉定区| 比如县| 仁布县| 安岳县| 灵璧县|